XLC130 Crawler Crane
Project
|
unit
|
XLC130
|
|
Maximum rated lifting capacity
|
Main boom condition
|
t
|
130
|
Arm end pulley working condition
|
t
|
13.5
|
|
Fixed jib condition
|
t
|
45
|
|
Tower jib condition (optional)
|
t
|
45
|
|
Maximum lifting moment
|
t.m
|
742.2
|
|
Dimensional parameters
|
Length of main boom
|
m
|
20~74
|
Fixed jib length
|
m
|
13~31
|
|
The length of the main boom in the fixed jib case
|
m
|
20~53
|
|
The longest combination of main boom + fixed jib
|
m
|
47+31/50+28
|
|
Tower jib length (optional)
|
m
|
22~49
|
|
The length of the main boom in the tower jib case
|
m
|
20~50
|
|
The longest combination of main arm + tower arm
|
m
|
47+49
|
|
Speed parameters
|
Lifting maximum single rope speed
|
m/min
|
120
|
The maximum single-rope speed of the main boom luffing
|
m/min
|
60
|
|
The maximum single-rope speed of tower arm luffing
|
m/min
|
75
|
|
Maximum swing speed
|
rpm
|
1.1
|
|
Maximum travel speed
|
km/h
|
1.5
|
|
motor
|
Rated power
|
kW
|
265
|
Emission standards
|
One
|
Non-road country IV
|
|
Weight of the whole machine (basic main boom, main hook)
|
t
|
131
|